Pro Air Conditioning & Electric
Pro Air Conditioning & Electric

Fine Quality Jobs Done by Pro Air Conditioning and Electric's Commercial Division

Costabella Condos of Punta Gorda
Installation of all HVAC equipment and air distribution systems as per plans and specs for condos.
The Vines of Port Charlotte, Fl.
Installation of all HVAC equipment and air distribution systems as per plans and specs to include: (14) 3 ton RTU's, (3) 4 ton RTU's and (3) 5 ton RTU's.
Kings Gate Country Club of Port Charlotte, Fl.
A total of 190 tons of air conditioning, ductwork, exhaust, make up air, refrigeration and kitchen hoods all installed.
Clubhouse for Centex Homes of Port Charlotte, Fl.
Installation of all HVAC equipment and air distribution systems as per plans and specs to include: 63 tons of HVAC equipment.
Silverman Eye Associates of Sarasota, Fl  
Installation of all HVAC equipment and air distribution as per plans and specs to include: 35 tons of roof top equipment for offices, OR and lab.
LaQuinta Inn — 3 story hotel of Port Charlotte, Fl.
Installation of all HVAC equipment and air distribution systems as per plans and spec to include: (1) 10 ton, (1) 20 ton system and centralized exhaust systems for guest room and duct work.
Giselle Ielba Restaurant of Punta Gorda, Fl.
Installation of all HVAC equipment and air distribution systems as per plans and specs to include:(2) 4 tons and (1) 5 ton system.
Best Western, Bradenton , Fl  
All HVAC work for 3 story hotel
American Signature Furniture of Port Charlotte, Fl.
Installation of all air distribution systems as per plans and specs to include: Ductwork installation to existing Lennox RTU and split systems equaling 150 tons.
First Baptist Church
Installation of all HVAC equipment and air distribution systems as per plans and specs to include:The Main Chapel — remove and replace (2) 7.5 tons of equipment and (3) 7.5 tons of ductwork. Social Area — Supply and replace (2) existing 5 ton A/H coils with (2) Rheem 5 ton A/H coils.The Pastors House — Remove and reinstall A/H coil and ductwork with supply and returns.
Pizza Hut #12323 & #12325 of Port Charlotte & Punta Gorda, Fl.
Installation of all HVAC equipment and air distribution systems as per plans and specs to include: Store # 12325 — Installation of (1) 22 ton outdoor 73% outdoor make up air DX cooling and dehumidification unit. 10 ton RTU for kitchen area. Store #12323 — Installation of owner provided (2) 15 ton and (1) 12.5 ton systems including ductwork.
Sumter Crossing Shopping Center of North Port, Fl.
Installation of all HVAC equipment and air distribution systems as per plans and specs consisting of (20) 5 ton RTU package units, (6) 4 ton units and (2) 10 ton RTU's and all duct work.
Holy Trinity Lutheran Church of Port Charlotte, Fl.
Installation of all HVAC equipment and air distribution systems as per plans and specs to include:Installation of new ductwork and other approved installation. Total of 60 ton if air conditioning.
Carrousel Center of Port Charlotte, Fl.
Installation of all HVAC equipment and air distribution systems as per plans and specs in shopping center project. Total of multiple store units equaling 35 package RTU's.
Buffalo Wild Wings — North Port & Riverside
Installation of all HVAC equipment and air distribution systems as per plans and specs each store consisting of (4) package RTU's equally totaling 50 tons and spiral duct, kitchen hood and exhaust systems.
Jason's Deli of Port Charlotte & Tampa, Fl.  
Installation of all HVAC equipment and air distribution systems as per plans and specs. 4 RTU's equaling 35 ton, (4) kitchen exhaust hoods and systems, all line and walk in refrigeration equipment and make up air systems.
info@pro-airconditioning.com

License #CAC1814977
License #EC13002038
© Copyright 2002-2008 Pro Air Conditioning & Electric
All rights reserved.
Pro Air Conditioning & Electric

17194 Toledo Blade Blvd.
Port Charlotte, Florida 33954
Phone: 941-624-5515
Fax: 941-624-2126
 
Website Design by Tropical Web Works